So in my quest for more energy independence, I want to add a battery to the house. I want to do this in phases, starting with a battery, then transitioning some of my solar panels to the battery directly, then based on experience either transition more solar panels, or add another battery, or both.
Here's a quick illustration... currently 17 solar panels feed the grid and my 200 amp service. And from that service is a 50 amp sub panel that feeds my hot tub and EV charging, and a couple other 15amp breakers for plugs in the garage, etc.
This is what I want to do next: Cut the wire that runs between the main panel and sub panel, and add a plug and socket. So without adding anything else, add the capability to unplug the sub panel by just yanking the big scary 4-prong plug out of a socket on the wall. Or keep it plugged in and it's doing the same thing it does currently. This then gives me the ability to put a battery between the main panel and sub panel, like this:
Simple enough, right? So if I just leave that battery plugged in all the time I haven't really solved anything, other than I could still use the hot tub and probably charge the car 1 time during a power outage. Don't get too hung up on total wattage need, outage time, etc., as I don't know that it's really necessary.
Phase 2 then involves diverting some of my solar panels directly into the battery. Which then opens up the option of unplugging the battery from the main panel. Idea being, I start to figure out if I can charge a car x times per week and keep the hot tub running, only from solar charging... or do I still need to plug the battery in on occasion, etc. Here's what that setup looks like visually:
Then Phase 3 is really determined by how well phase 2 is working... if I'm always having to plug the battery in, I can divert (or just add) more solar panels. OTOH, if my solar gets the battery to 100% fairly regularly but I'm running out of juice, then I can add another battery. And once the system feels pretty sustainable, then what else can I move from the main panel to the sub panel, most obvious targets being AC and/or a heat pump, others being some of the plugs in the kitchen (fridge) or plugs in the bedrooms.
What I know I need is...
- a plug on the battery for the 50 amp sub panel
- good amount of amp hour capacity, like 4kwh minimum
- capability to charge from the solar panel inverters- I believe they put out 240v at like 1 amp (Enphase IQ)
- expandable. Want to be able to add a second, maybe even a third battery.
What I don't know I need is..
- a control panel?
- something else I haven't considered.
Here's a quick illustration... currently 17 solar panels feed the grid and my 200 amp service. And from that service is a 50 amp sub panel that feeds my hot tub and EV charging, and a couple other 15amp breakers for plugs in the garage, etc.
This is what I want to do next: Cut the wire that runs between the main panel and sub panel, and add a plug and socket. So without adding anything else, add the capability to unplug the sub panel by just yanking the big scary 4-prong plug out of a socket on the wall. Or keep it plugged in and it's doing the same thing it does currently. This then gives me the ability to put a battery between the main panel and sub panel, like this:
Simple enough, right? So if I just leave that battery plugged in all the time I haven't really solved anything, other than I could still use the hot tub and probably charge the car 1 time during a power outage. Don't get too hung up on total wattage need, outage time, etc., as I don't know that it's really necessary.
Phase 2 then involves diverting some of my solar panels directly into the battery. Which then opens up the option of unplugging the battery from the main panel. Idea being, I start to figure out if I can charge a car x times per week and keep the hot tub running, only from solar charging... or do I still need to plug the battery in on occasion, etc. Here's what that setup looks like visually:
Then Phase 3 is really determined by how well phase 2 is working... if I'm always having to plug the battery in, I can divert (or just add) more solar panels. OTOH, if my solar gets the battery to 100% fairly regularly but I'm running out of juice, then I can add another battery. And once the system feels pretty sustainable, then what else can I move from the main panel to the sub panel, most obvious targets being AC and/or a heat pump, others being some of the plugs in the kitchen (fridge) or plugs in the bedrooms.
What I know I need is...
- a plug on the battery for the 50 amp sub panel
- good amount of amp hour capacity, like 4kwh minimum
- capability to charge from the solar panel inverters- I believe they put out 240v at like 1 amp (Enphase IQ)
- expandable. Want to be able to add a second, maybe even a third battery.
What I don't know I need is..
- a control panel?
- something else I haven't considered.