The thrash continues...
Items done: (its like dominos)
Needed to fill tcase so...
Parking brake in and adjusted.
New speedo cable installed with new felt seal.
The old drive was missing only the casing was there.
Filled trans and tcase
Installed the shafts from rocky mountain. They balanced them put in new u-joints and re-phased one yoke.
Front brakes looked good
Put on tires
Painted up new shroud from mikes discount toyota parts warehouse.
Installed new belts. Saved belt labels cause that was a colossal waste of time getting them right by application in the part store computers.
Finished install of radiator including good rubber instead of the water wicking old insulators.
Finished up battery tray.
Got group 27 battery.
Installed all the various inspection covers and splash shields.
Filled radiator.
Filled engine oil.
Clutch master expected delivery Wednesday.
EGR hardware, mirrors and other smalls Tuesday.
Brake master Tuesday.
Mechanical oil pressure gauge Tuesday.
I had ordered a 1/8"bspt male to 1/8" npt female adapter then I used another egr bolt that had threads for the original electric oil pressure sender. So now I can have both. I want verification on this motor. I want no doubts.
I picked a vintage looking gauge cause I wanted it to look right.
I think a newer style gauge would look silly. I will mount it in some non-intrusive way.
I have its twin for water temp but the probe is really long so I am still thinking on that one
So tomorrow we drag it down to a&a performance exhaust.
Then its back Wednesday to finish out the list..all parts should be in hand by then.
Putting it and me to bed for the night.
Literally everything that can be done is now done without the parts we are waiting on other than some spit and shine.
That will have to wait till the rally is over and the dust settles and the wife has at least one of the three bays back to use lol
The garage looks beat but the beast looks good..poised and ready to be freed from its 2.5 year incarceration.