OBVIOUSLY, this needs to be coordinated with the district, but we need to start planning this, as I need the kiosk out of my area before a scrap guy thinks it's for them.
By my count, here is what we will need for installation:
powered auger
laser level
quick setting concrete
fiber additive
mesh rebar
post tubes
six to ten tempory fence posts (green thingies)
3-4 20' stickes of 2" angle
torch set or portable welder
water (for concrete)
beer (for workers)
The Plan as I see it:
auger holes
raise assembled kiosk (can be safely done with 5~6 bodies)
set plumb by anchoring temp posts, and welding angle to kiosk and temp posts
pour concrete
rest overnight
remove temp supports.
We will need TWO trailers. One for the kiosk, NOT big, but I don't want to overload the trailer for the dirt road and one for the gear.
Mr. Morgan, the ball is back in your court!
By my count, here is what we will need for installation:
powered auger
laser level
quick setting concrete
fiber additive
mesh rebar
post tubes
six to ten tempory fence posts (green thingies)
3-4 20' stickes of 2" angle
torch set or portable welder
water (for concrete)
beer (for workers)
The Plan as I see it:
auger holes
raise assembled kiosk (can be safely done with 5~6 bodies)
set plumb by anchoring temp posts, and welding angle to kiosk and temp posts
pour concrete
rest overnight
remove temp supports.
We will need TWO trailers. One for the kiosk, NOT big, but I don't want to overload the trailer for the dirt road and one for the gear.