That dang ARB tried to beat me but I just kept at it. Now with my VAST experience I bet I could install another identical setup in under 2 days
Life would be easier if I wasn't modding my DD rig and I could just start and stop whenever rather than having to make sure I get to a point where I can drive the thing each time. As usual it was the little things added WAY too much time: overthinking the fairlead, needing longer bolts, ARB's non idiot-proof directions, fubarred ring terminal on the winch positive cable, etc. etc.
But, here it is...Just had to say "I DID IT!!"
Some pics to document the glorious occassion. From start to finish:
Life would be easier if I wasn't modding my DD rig and I could just start and stop whenever rather than having to make sure I get to a point where I can drive the thing each time. As usual it was the little things added WAY too much time: overthinking the fairlead, needing longer bolts, ARB's non idiot-proof directions, fubarred ring terminal on the winch positive cable, etc. etc.
But, here it is...Just had to say "I DID IT!!"
Some pics to document the glorious occassion. From start to finish: