nuclearlemon
Hard Core 4+
if you want.
sunday, i'll be home all day applying all kinda new pieces to my 80
the raffle rig should be there too. we are sooooooo freakin' close to done it ain't funny.
to do looks like this.
re bleed brakes
mount/wire power plugs
mount/hookup trans cooler
add second battery (awaiting battery/tray/wiring)
correct bolts/tighten sway bar links
cut down front u bolts
hookup second o2 sensor (sounds easy, but i've spent a bit o time looking and i'll be damned if i can figger out where the heck it hooks in)
still havin' issues with that pesky right rear window. the old motor couldn't even pass the battery test...what the heck is wrong with new regulator and door lock?)
tune up/install shift fork/install o2sensor gaskets (uncle ben will do this).
we have off road lights coming, but until i see them, i'm not considering them on the list to be done.
now, the downside....hopefully, the rig will be gone from sept 1st - oct 20th, so we wont' be able to work on it (unless you want to go visit the western slope) so we need to get this done before then....
COME ON FOLKS...WE'RE ALMOST THERE!!!!!!!!!!!!!!!!!!!
btw, i want to thank rising sun for helping build the MOST KICKASS RIG IN THE COA4WDCI HISTORY!!!!!!!!!!!!!!!!
sunday, i'll be home all day applying all kinda new pieces to my 80
the raffle rig should be there too. we are sooooooo freakin' close to done it ain't funny.
to do looks like this.
re bleed brakes
mount/wire power plugs
mount/hookup trans cooler
add second battery (awaiting battery/tray/wiring)
correct bolts/tighten sway bar links
cut down front u bolts
hookup second o2 sensor (sounds easy, but i've spent a bit o time looking and i'll be damned if i can figger out where the heck it hooks in)
still havin' issues with that pesky right rear window. the old motor couldn't even pass the battery test...what the heck is wrong with new regulator and door lock?)
tune up/install shift fork/install o2sensor gaskets (uncle ben will do this).
we have off road lights coming, but until i see them, i'm not considering them on the list to be done.
now, the downside....hopefully, the rig will be gone from sept 1st - oct 20th, so we wont' be able to work on it (unless you want to go visit the western slope) so we need to get this done before then....
COME ON FOLKS...WE'RE ALMOST THERE!!!!!!!!!!!!!!!!!!!
btw, i want to thank rising sun for helping build the MOST KICKASS RIG IN THE COA4WDCI HISTORY!!!!!!!!!!!!!!!!