• RS MAY CLUB MEETING
    Hi Guest: Our monthly RS meeting on Wed. May 1st will be held at the Rooney Sports Complex. Details and directions are here. Early start time: 7:00 pm. to take advantage of daylight. We'll be talking ColoYota Expo and Cruise Moab.
    If you are eligible for club membership, please fill out an application in advance of the meeting and bring it with you.

BRD meeting 5/24/2018

Uncle Ben

Hard Core 4+
Joined
Aug 23, 2005
Messages
14,144
Location
Northside
Sorry for the short notice!!! Next meeting is Thurs, May 24th starting at 5pm here at our office in north Boulder (2140 Yarmouth Ave.)

NEW this month is a conference call line that people can call into if they can’t make it!
· Simply call 888-844-9904 (don’t worry its FREE)
· When prompted dial the Access Code 9066578
· Please put your phone on mute so we don’t hear background noise, it can be distracting.

Agenda:
Planning:
Ø Next Meeting?
Ø Lefthand – no updates.
o Lefthand Motorized Roads and Trails Project (what we all call Lefthand OHV – has been entered into the SOPA: http://www.fs.fed.us/sopa/state-level.php?co.
o Inventory report – out to the public?
Ø Recreation Sports Shooting – in case you are interested in what’s going on see this website http://www.sportshootingpartners.org/
Ø Annual VSAs – We have signed agreements from TRR and OSCO, still waiting on VSAs from NORAC and Rising Sun!!!

Adopt-A-Trail Project Specifics
Bunce (NORAC/Backbone Dates Need to Reschedule)
· Opening clean-up
· Extend fence around main shooting area on 217
· (new) 105 Gate bypass blocking
· Sign routes for positive reinforcement
· Ground cover dispersal – mulch from BLRA
· NORAC adopting just the 203 (T33 road) and Backbone has already adopted the remaining.
Park/Cave Creek: (Backbone/NORAC Date Reschedule & June 16th)
· Check on and sign historic uphill route, ensure people are staying off.
· Fencing for braided sections, many locations – 200 feet of fence and signage necessary.
· Camping area fencing, restoration work, and signs. – 80 feet of fence.
· End of 202.C two sections fence blocking illegal extension of 4WD which turns to ATV trail. – 30 feet of fence.
· End of 202.1 – block route from extending past MVUM, about 40 feet of fence and some signage.
· End of 201.1 needs some blocking – 60 feet of fence and signage.
Caribou: (NORAC Dates June 30th, Pre-trip assessment June 17th)
· Abandoned vehicles on trail? Black ranger?
· Repair sections of fence (Northern most campsites) - 140 feet of fence.
· Hazard tree assessment of designated campsites.
· Replace fence on Boulder Watershed property? – 300 feet, they are buying?
o Eric Johnson 303-258-3259
§ Left VM on 3/30 @ 1400
MSV/Coney: (TRR Dates June 23/24)
· Meet at Parking lot 9am, overnight camping at flats
· Opening – probably a lot of trees to remove.
· Check on mud hole fix and possible soft spot developing just south of fix.
· Coney Dry lake bed 200’ fence building (stump and rail)
o Matt C. to survey for trees to use the day prior?
o Hole log across short stumps fence, some material delivered to site.
o Stay the Trail was willing to possibly donate materials
· MSV mud hole bypass bridge plank replacement
o Check with Eng. on bridge replacement – check with Matt H and Jon on construction.
o Most materials delivered to site.
o 24” wide, 7 sections 8’ long, 2 sections of 29.5” long steps at ends
o 2 logs 8’ long and 2 16’ logs – native local material.
· MSV first obstacle replacement huge sign – 4WD high clearance only
o Sign just needs to be installed.
· Unauthorized route blockage
Miller Rock: (TRR Date June 9/10)
· Obstacle repair south of St. Vrain Creek, rock outcrop
o Engineering has made some recommendations using gabion baskets.
§ Gabion baskets are in stock.
§ Fabric already in stock.
§ Rock drill and ¾” bit x 12” for rebar anchors.
§ Rebar ½”
§ We have a jackhammer and hammer drill with mason bits.
§ Generators
Kingston/Mammoth: (NORAC Dates July 21-22? Pending weather)
· Coordinate with Scott Makey 720-504-5507 from Rising Sun (CCRD side of Mammoth)
· Two vehicles stuck still (Landcruiser and Cherokee)– will likely keep gates closed until this has been removed.
o Might look at closures sooner rather than later – chat with Brandt at CCRD
· Fence repair work just west of the gate on James Peak road – 80 feet of fence
· Meadow flats – Karen – sent e-mail 3/30
Jenny Creek: (Rising Sun Date TBD)
· Buck-n-rail where needed, common bypasses.
· Will need to assess the mud-bog area between Jenny and Rollins road.
· Post and cable maintenance
· Campsite restoration
Switz Trail: (OSCO Dates Sat. May 5th)
· RECAP!
· Spring Clean-up run
· Campsite restoration/obliteration
· Inventory signage needs
· Check on social routes and block as necessary
Rollins Pass Road: (OSCO Sun July 15th)
· Trail Clean-up run
· Jenny Lake camping area plan and modification
· Bypass route near the top needs to be blocked and re-vegetated.

MHJC – New Patrol 19 – looking to adopt maybe Rock Creek or Johnny Park?

Thanks and looking forward to seeing everyone again!

USFS
Jared Smith
Developed & Dispersed
Recreation Manager
USDA Forest Service
Arapaho and Roosevelt National Forests &
Pawnee National Grassland
Boulder Ranger District
p: 303-541-2508
f: 303-541-2515
jaredasmith@fs.fed.us
2140 Yarmouth Avenue
Boulder, CO 80301
www.fs.usda.gov/arp
http://fsweb.wo.fs.fed.us/esignature/images/usda-logo.pngTwitterFacebook

Caring for the land and serving people







This electronic message contains information generated by the USDA solely for the intended recipients. Any unauthorized interception of this message or the use or disclosure of the information it contains may violate the law and subject the violator to civil or criminal penalties. If you believe you have received this message in error, please notify the sender and delete the email immediately.
 

rover67

Rising Sun Member
Joined
Nov 1, 2007
Messages
9,322
Location
Boulder, Co
I will call in, also will get the volunteer service agreement done today.
 

AimCOTaco

Cruise Moab Committee
Staff member
Cruise Moab Committee
Joined
Aug 13, 2010
Messages
2,267
Location
Longmont, CO
Currently planning to go if I can slip the bonds....
 

Uncle Ben

Hard Core 4+
Joined
Aug 23, 2005
Messages
14,144
Location
Northside
I will call in, also will get the volunteer service agreement done today.

Thank you Marco and Andy! Stopperd in today and chatted with Matt for a few minutes as Jared was out. Once Jared returns my call later today I’ll let Marco know details.
 

rover67

Rising Sun Member
Joined
Nov 1, 2007
Messages
9,322
Location
Boulder, Co
VSA is done and emailed back to them!
 

rover67

Rising Sun Member
Joined
Nov 1, 2007
Messages
9,322
Location
Boulder, Co
Well the conference number works well. I was able to get on and chat.

I updated Jared and the group on the two vehicles on Kingston peak, there were some questions there so I thought it was prudent to let them know that it was being taken care of.

Lefthand is still in limbo it sounds like, Jared didn't have any updates on it. There are always folks pushing on this issue and it is frustrating. He says something's gonna happen but it just seems like it keeps getting pushed out. If you mountain bike, or hike you can go up there. It has basically turned into a MTB area....

I also sent him the VSA which he confirmed he had received.

Also we discussed proposed dates for the Jenny Creek Workday. Typically we do it in August. I was thinking either the 11th, 18th, or 25th. I'll start a thread to see what works for folks.
 

AimCOTaco

Cruise Moab Committee
Staff member
Cruise Moab Committee
Joined
Aug 13, 2010
Messages
2,267
Location
Longmont, CO
Thanks Marco, I didn't escape the plant until close to 6 last night so did not make it down. Glad you were able to comment and not just monitor on the call in line.

Thanks again for representing RS,
 
Top