BRD meeting 3-29-2018, 5 pm

Uncle Ben

Hard Core 4+
Joined
Aug 23, 2005
Messages
14,144
Location
Northside
Next meeting is Thurs, March 29nd starting at 5pm here at our office in north Boulder (2140 Yarmouth Ave.)

NEW this month is a conference call line that people can call into if they can’t make it!
· Simply call 888-844-9904 (don’t worry its FREE)
· When prompted dial the Access Code 9066578
· Please put your phone on mute so we don’t hear background noise, it can be distracting.

Agenda:
Planning:
Ø Lefthand – no updates.
o Lefthand Motorized Roads and Trails Project (what we all call Lefthand OHV – has been entered into the SOPA: http://www.fs.fed.us/sopa/state-level.php?co.
Ø Recreation Sports Shooting – in case you are interested in what’s going on see this website http://www.sportshootingpartners.org/
Ø Annual VSAs – We have signed agreements from TRR and OSCO.
Ø Volunteer Project Data Collection (see attachment)

o Project Name and dates

o A short sentence describing the project

o Attached Spreadsheet filled out as completely as possible (hours, ages, ethnicity, etc.)

Adopt-A-Trail Project Specifics
Bunce (NORAC/Backbone Dates TBD)
· Opening clean-up
· Extend fence around main shooting area on 217
· Sign routes for positive reinforcement
· Ground cover dispersal – mulch from BLRA
· I have NORAC adopting just the 203 (T33 road) and Backbone adopting the remaining – is that still the plan?
Park/Cave Creek: (Backbone/NORAC Date TBD May or June)
· Check on and sign historic uphill route, ensure people are staying off.
· Fencing for braided sections, many locations – 200 feet of fence and signage necessary.
· Camping area fencing, restoration work, and signs. – 80 feet of fence.
· End of 202.C two sections fence blocking illegal extension of 4WD which turns to ATV trail. – 30 feet of fence.
· End of 202.1 – block route from extending past MVUM, about 40 feet of fence and some signage.
· End of 201.1 needs some blocking – 60 feet of fence and signage.
Caribou: (NORAC Dates TBD)
· Repair sections of fence (Northern most campsites) - 140 feet of fence.
· Hazard tree assessment of designated campsites.
· Replace fence on Boulder Watershed property? – 300 feet, they are buying?
o Eric Johnson 303-258-3259
o Do we have updates from them?
MSV/Coney: (TRR Dates June 23/24)
· Opening – probably a lot of trees to remove.
· Check on mud hole fix and possible soft spot developing just south of fix.
· Coney Dry lake bed 200’ fence building (stump and rail)
o Hole log across short stumps fence, some material delivered to site.
o Stay the Trail was willing to possibly donate materials
· MSV mud hole bypass bridge plank replacement
o Check with Eng. on bridge replacement
o Most materials delivered to site.
o 24” wide, 7 sections 8’ long, 2 sections of 29.5” long steps at ends
o 2 logs 8’ long and 2 16’ logs – native local material.
· MSV first obstacle replacement huge sign – 4WD high clearance only
o Sign just needs to be installed.
· Unauthorized route blockage
Miller Rock: (TRR Date June 9/10)
· Obstacle repair south of St. Vrain Creek, rock outcrop
o Engineering has made some recommendations using gabion baskets.
§ Gabion baskets are in stock.
§ Fabric already in stock.
§ Rock drill and ¾” bit x 12” for rebar anchors.
§ Rebar ½”
§ We have a jackhammer and hammer drill with mason bits.
§ Generators
Kingston/Mammoth: (NORAC Dates TBD)
· Coordinate with Scott Makey 720-504-5507 from Rising Sun (CCRD side of Mammoth)
· At least one stuck vehicle still up there – will likely keep gates closed until this has been removed.
o Might look at closures sooner rather than later – chat with Brandt at CCRD
· Fence repair work just west of the gate on James Peak road – 80 feet of fence
Jenny Creek: (Rising Sun Date TBD)
· Buck-n-rail where needed, common bypasses.
· Will need to assess the mud-bog area between Jenny and Rollins road.
· Post and cable maintenance
· Campsite restoration

Switz Trail: (OSCO Dates Sat. May 5th)
· Spring Clean-up run
· Campsite restoration/obliteration
· Inventory signage needs
· Check on social routes and block as necessary
Rollins Pass Road: (OSCO Sun July 15th)
· Trail Clean-up run
· Jenny Lake camping area plan and modification
· Bypass route near the top needs to be blocked and re-vegetated.


Thanks and looking forward to seeing everyone again!

USFS
Jared Smith
Developed & Dispersed
Recreation Manager
USDA Forest Service
Arapaho and Roosevelt National Forests &
Pawnee National Grassland
Boulder Ranger District
p: 303-541-2508
f: 303-541-2515
jaredasmith@fs.fed.us
2140 Yarmouth Avenue
Boulder, CO 80301
www.fs.usda.gov/arp
http://fsweb.wo.fs.fed.us/esignature/images/usda-logo.pngTwitterFacebook

Caring for the land and serving people
 
Last edited by a moderator:

AxleIke

Hard Core 4+
Joined
Apr 20, 2006
Messages
4,747
Location
Broomfield, CO
Might want to update title. Currently says May 29. Thanks for posting up!
 

MountainGoat

Club Treasurer
Staff member
Cruise Moab Committee
Joined
Jul 4, 2008
Messages
3,066
Location
Evergreen, CO
Top